What We Do

Services

The full list of deck work we take on, from framing to finish.

HomeServices

Everything we take on

Every job below is one we do ourselves across Fresno.

Deck Installation

We frame new decks from the footings up, using post bases and joist hangers rated for treated lumber. Spacing and beam sizing follow span tables for the load and the height off the ground, not a guess. Most jobs run from a simple ground-level platform to a raised deck with stairs and rail.

Deck Repair

Soft boards, a bouncy spot underfoot, a post that's started to lean, we go find the actual cause instead of just swapping the board on top. A lot of the time the real problem is a joist that's rotted where it meets the ledger or a footing that's shifted. We fix the structure first, then the surface.

Deck Staining & Sealing

Sun in the Central Valley dries and cracks unsealed wood faster than most people expect. We pressure wash, let the boards dry fully, then stain or seal with a product rated for UV. Skip a year out here and you're usually looking at sanding, not just a fresh coat.

Custom Deck Design

We'll walk your yard and lay out a deck around how you actually use it, not a standard rectangle. That includes working out stair placement, railing style, and where the structure needs extra beam support for a hot tub or an outdoor kitchen.

Composite Decking Installation

Composite boards like Trex or TimberTech don't need yearly staining and won't splinter, but they still need the framing underneath done right. We use hidden fastener clips on most composite jobs for a cleaner surface with no screw heads.

Deck Railing Installation & Repair

Railings take the most abuse on a deck, kids lean on them, dogs jump at them, and code has specific requirements on height and baluster spacing. We rebuild loose or out-of-code railings and can match wood or cable rail to whatever style your deck already has.

Deck Resurfacing & Board Replacement

If the frame underneath is still solid but the decking boards are cupped, splintered or faded past saving, we pull just the boards and put down new decking on your existing structure. It's a faster job than a full rebuild and costs a lot less.

Deck Framing & Structural Repair

This is the part nobody sees once it's finished: ledger flashing, joist hangers, beam sizing, footing depth. A deck that fails almost always fails here first, not in the decking boards on top, so we don't cut corners on it.

Deck Demolition & Removal

Old decks get torn out and hauled off, including old concrete piers if you're not reusing the footprint. We check whether the existing footings can be reused before we demo anything, since that can save you money on the rebuild.

Pergolas & Deck Covers

A lot of our deck clients end up wanting shade over part of the structure. We build pergolas and partial covers tied into the deck framing, sized to actually hold up under wind rather than just look good.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Fresno, CA

Deck installation and repair across the greater Fresno area.

Fresno, CA
Visalia, CA
Clovis, CA
Tulare, CA
Madera, CA
Hanford, CA
Sanger, CA
Reedley, CA
Selma, CA
Kerman, CA
Kingsburg, CA
Common Questions

Things worth asking

Questions that come up once a deck project is underway.

Do I need a permit to build a deck?
Most decks over 30 inches off the ground require a building permit in Fresno and surrounding jurisdictions, along with a footing inspection and a framing inspection before the decking goes down. Lower decks may still need a permit depending on the local code, so it's checked before construction starts.
How long does it take to build a deck?
A standard ground-level or low deck usually takes about a week to ten days to frame and finish once permits are approved. A raised deck with stairs, custom railing, or a cover takes longer, sometimes two to three weeks.
Can you build a deck to a specific budget?
Deck size, decking material, and railing style can all be adjusted to fit a target budget. Pressure-treated lumber costs less upfront than composite, though composite requires less upkeep over time.
Do you guarantee your deck work?
Workmanship on deck construction and repair is typically guaranteed, with the specific terms and length written into the quote. Manufacturer warranties on materials like composite decking are separate and passed along to the homeowner.
Who will I be dealing with during the project?
One crew usually handles a deck project from framing through the final coat of stain or sealant, so the same people are on site throughout the job. Questions during the project go to that crew lead rather than a rotating point of contact.
What decking materials do you work with?
Pressure-treated pine, cedar, and composite brands like Trex and TimberTech are all common choices depending on budget and maintenance preference. Fasteners and hardware are matched to whichever lumber is used, since treated wood requires galvanized or stainless connectors to avoid corrosion.
Can I still use my yard while the deck is being built?
Most of a yard stays usable during deck construction, since work is contained to the footprint of the deck itself. Access to that section of yard is limited during footing and framing work for safety around open holes and power tools.
What should I do to prepare before the work starts?
Clearing furniture, planters, and anything else off the existing deck or the build site ahead of time speeds up the first day. Sprinkler heads and buried lines in the footing area should also be flagged if their locations aren't obvious.
What happens if you find a problem once the old deck is torn out?
Rotted framing, undersized footings, or an out-of-code railing sometimes show up once old decking is pulled off. Any changes to the scope or cost should be discussed and approved before the work continues, not added to the bill afterward.
How do I take care of a new deck?
Pressure-treated and cedar decks need restaining every one to three years depending on sun exposure, especially in a climate as sunny as the Central Valley. Composite decking just requires periodic washing to keep dirt from building up in the grain.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (559) 491-1886